Servicing

Frequency of maintenance will vary depending upon the pollutant load of the surrounding area. A newly installed strcuture should be inspected every few months to determine service frequency and develop a routine maintenance plan.

For an area with high volume of foliage/debris the screen system would be serviced every 3-4 months and the lower sediment chambers every 6 months.

  • Manholes or Hatches precast into the lid of the structure provide plenty of access.  No need to enter the structure.
  • A vaccum truck may be used to remove debris from the screen system.
  • The screen is hinged to allow easy access into the lower chambers to vaccum collected sediment.
  • The absorption boom should be replaced when it appears to be saturated with oils (darkened in color).
  • Dampers to block off water flow during servicing can be incorporated into the structure.